Electrical power UNITS FOR DOUBLE-SCISSORS LIFT

Basic Description
Outfitted together with the zero leak bidirectional checking sole-noid valves, this power POWER%20UNITS%20FOR%20DOUBLE SCISSORS%20LIFT1 - Electrical power UNITS FOR DOUBLE-SCISSORS LIFTunit is developed for that operation of two independent circuits. Which are respectively for that principal and subordinate platforms on the double scissors lift. Two cut-off valves are made use of for lowering the machine manually in situation of energy loss. If a lot more independent circuits are necessary for the application please contact us for availability.
Remark: 1. Please seek advice from our income engineer for your various pump displacement, motor energy or tank capacity.
2. CSA or UL certified motors can be found upon request.
Distinctive Notes
one. The AC motor is of S3 duty cycle, which might only function intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean each of the hydraulic components concerned just before set up of the energy unit.
3. Viscosity from the oil shoud be 15~46 cst,and also the oil really should be clean and no cost of impurities,N46 hydraulic oil is recommended.
four. The power unit need to be mounted vertically.
5. Check the oil level from the tank right after the preliminary running on the energy unit.
6. Oil shifting is needed after the original 100 operation hrs,afterwards when just about every 3000 hrs.

Share your love
en_US