Steel Pintel Chain

Category:

Steel Pintel Chain

 

Steel Pintel Chain D205 Steel Pintel Chain,662 Steel Pintel Chain,662H Steel Pintel Chain,667X Steel Pintel Chain,667XH Steel Pintel Chain,667H Steel Pintel Chain,667J Steel Pintel Chain,667K Steel Pintel Chain,88K Steel Pintel Chain,D88C Steel Pintel Chain

 

Chain,Chains,Steel Pintel Chain D205,662,662H,667X,667XH,667H,667J,667K,88K,D88C

1.Standards: ISO /DIN /ANSI
2.Model: 25-160,04B-32B Duplex,Heavy duty
3.Materials:Carbon steel 40Mn stainless steel

Double Roller Chain

1.All parts are heat treatment(quenching and tempering) and controlled in a reasonable tolerance range.

2.Tensile strength:15-20% higher than the standard

3.Certificate of Quality: ISO 9001:2000,SGS

4.Centreless grinding.

5.Good lubrication with excellent grease.

6.Color:self,dark yellow,dark blue,black

Materials Available

1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420
2. Steel:C45(K1045), C46(K1046),C20
3. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)
4. Bronze: C51000, C52100, C54400, etc
5. Iron: 1213, 12L14,1215
6. Aluminum: Al6061, Al6063
7.OEM according to your request

Surface Treatment

Annealing, natural canonization, heat treatment, polishing, nickel plating, chrome plating, zinc plating,yellow passivization, gold passivization, satin, Black surface painted etc.

Processing Method

CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly

QC & Certificate

Technicians self-check in production,final-check before package by professional Quality inspector
ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009

Package & Lead Time

Size: Drawings
Wooden Case/Container and pallet, or as per customized specifications.
15-25days samples. 30-45days offcial order
Port: Shanghai/Ningbo port

FAQ

Q: Are you trading company or manufacturer ?
A: Our group consists in 3 factories and 2 abroad sales corporations.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: How long is your delivery time ? What is your terms of payment ?
A: Generally it is 40-45 days. The time may vary depending on the product and the level of customization. For standard products, the payment is: 30% T/T in advance ,balance before shipment.

Q: What is the exact MOQ or price for your product ?
A: As an OEM company, we can provide and adapt our products to a wide range of needs.Thus, MOQ and price may greatly vary with size, material and further specifications; For instance, costly products or standard products will usually have a lower MOQ. Please contact us with all relevant details to get the most accurate quotation.

worm reducers, sprockets, racks, gears, gearboxes, chain, pulleys, gear shafts, electric motors…