Feeder Mixer Gearboxes

Planetary Gearboxes Mixer Made In

ITEM no. Ratio Power KW Output Torque (Nm) Input speed(r.p.m) weigh(Kg)
E1 14.60 61.97 16000 540 256
E2 18.20 46.61 15000 540 256
E3 28.27 59.27 16000 1000 290
E4 16.13 55.04 15700 540 256
E5 18.20 41.95 13500 540 256
E6 21.10 32.16 12010 540 256
E7 13.40 76.05 18020 540 280
E8 28.27 61.12 16500 1000 330
E9 25.89 72.89 18020 1000 290
E10 13.40 67.52 16000 540 256
E11 25.89 34.95 16000 540 290
E12 13.40 67.52 16000 540 256
E13 18.20 41.95 13500 540 256
E14 21.10 32.16 12000 540 256
E15 25.80 73.14 18020 1000 290
E16 13.38 76.16 18020 540 256

Details Catalog

Planetary-Gearboxes-mixers
Planetary-Gearboxes-mixers
Planetary-Gearboxes-mixers
Planetary-Gearboxes-mixers

planetary gearboxes & helical gearboxes for: feed mixer, truck mixer, Concrete mixers and other mixer transmission system.

planetary gearboxes & helical gearboxes for: feed mixer, truck mixer, Concrete mixers and other mixer transmission system.

We produce all kinds of planetary gearboxes & helical gearboxes for vertical feed mixers

planetary gearboxes & helical gearboxes for: feed mixer, truck mixer, Concrete mixers and other mixer transmission system.

planetary gearboxes & helical gearboxes for: feed mixer, truck mixer, Concrete mixers and other mixer transmission system.

Reel TMR Mixers , Reel Auggie Feed Mixers,


Drive of mixer ?treatment of poppy

planetary gearboxes & helical gearboxes for: vertical feed mixer, truck mixer, Transit mixers, Concrete mixers

Planetary gearboxes

planetary gearboxes & helical gearboxes for: feed mixer, truck mixer, Concrete mixers and other mixer transmission system.

Materials Available

1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420
2. Steel:C45(K1045), C46(K1046),C20
3. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)
4. Bronze: C51000, C52100, C54400, etc
5. Iron: 1213, 12L14,1215
6. Aluminum: Al6061, Al6063
7.OEM according to your request

Surface Treatment

Annealing, natural canonization, heat treatment, polishing, nickel plating, chrome plating, zinc plating,yellow passivization, gold passivization, satin, Black surface painted etc.

Processing Method

CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly

QC & Certificate

Technicians self-check in production,final-check before package by professional Quality inspector
ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009

Package & Lead Time

Size: Drawings
Wooden Case/Container and pallet, or as per customized specifications.
15-25days samples. 30-45days offcial order
Port: Shanghai/Ningbo port

FAQ

Q: Are you trading company or manufacturer ?
A: Our group consists in 3 factories and 2 abroad sales corporations.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: How long is your delivery time ? What is your terms of payment ?
A: Generally it is 40-45 days. The time may vary depending on the product and the level of customization. For standard products, the payment is: 30% T/T in advance ,balance before shipment.

Q: What is the exact MOQ or price for your product ?
A: As an OEM company, we can provide and adapt our products to a wide range of needs.Thus, MOQ and price may greatly vary with size, material and further specifications; For instance, costly products or standard products will usually have a lower MOQ. Please contact us with all relevant details to get the most accurate quotation.

worm reducers, sprockets, racks, gears, gearboxes, chain, pulleys, gear shafts, electric motors…